{"id":206,"date":"2013-09-24T12:13:34","date_gmt":"2013-09-24T10:13:34","guid":{"rendered":"http:\/\/wprafa.idener.es\/?page_id=206"},"modified":"2013-09-24T12:13:34","modified_gmt":"2013-09-24T10:13:34","slug":"workpackages","status":"publish","type":"page","link":"http:\/\/www.biogas2pemfc.eu\/?page_id=206","title":{"rendered":"WORK PACKAGES"},"content":{"rendered":"<p style=\"text-align: justify;\">In order to accomplish the main objectives of the project, a work plan broken down into seven work packages (WPs) has been established. The WPs also include management tasks, assessment of progress and exploitation of results:<\/p>\n<div class=\"shortcode-list shortcode-list-bullet\">\n<ul>\n<li>\n<p style=\"text-align: justify;\"><strong>WP1.<\/strong>\u00a0Biogas generation from olive mill wastes. This WP will perform research about yields of methane generation using co-substrates like olive mill wastes and manure. This is the key for the whole process, because it is the start point for the power generation and wastes valorisation.<\/p>\n<\/li>\n<li>\n<p style=\"text-align: justify;\"><strong>WP2.<\/strong>\u00a0Optimization of reforming technology and development of a novel fuel processor unit. This WP will design an optimized and cost-effective fuel processor unit that will assure an efficient conversion of biogas to hydrogen, focusing on improved catalysers and heat recovery.<\/p>\n<\/li>\n<li>\n<p style=\"text-align: justify;\"><strong>WP3.<\/strong>\u00a0Development of PEM-FC membranes adapted to H2 generated from biogas. This WP will research on novel PEM-FC membranes that will make possible the integration of this technology in a hydrogen reformate steam.<\/p>\n<\/li>\n<li>\n<p style=\"text-align: justify;\"><strong>WP4.<\/strong>\u00a0Modular system development. This WP will research on the overall subsystem integration, allowing as much heat recovery as possible and allowing a robust, automatic and efficient system operation.<\/p>\n<\/li>\n<li>\n<p style=\"text-align: justify;\"><strong>WP5.<\/strong>\u00a0Field tests of a pilot plant. This WP will provide evidence of the feasibility of the project as a possibility for valorising olive mill wastes by implementing a pilot plant in a real facility provided by FAECA, the Andalusian Agrarian Cooperatives Union.<\/p>\n<\/li>\n<li>\n<p style=\"text-align: justify;\"><strong>WP6.<\/strong>\u00a0Exploitation and dissemination. This WP will ensure the proper dissemination and exploitation of project results so that a right flow of knowledge can flow from RTD performers to SME.<\/p>\n<\/li>\n<li>\n<p style=\"text-align: justify;\"><strong>WP7.<\/strong>\u00a0Project management. This WP will ensure that project objectives are achieved by coordinating the consortium, managing tasks and developing financial administration.<\/p>\n<\/li>\n<\/ul>\n<\/div>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.biogas2pemfc.eu\/wp-content\/uploads\/2013\/09\/Pert.png\"><img loading=\"lazy\" class=\" wp-image-189 aligncenter\" alt=\"Pert\" src=\"http:\/\/www.biogas2pemfc.eu\/wp-content\/uploads\/2013\/09\/Pert.png\" width=\"500\" height=\"514\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In order to accomplish the main objectives of the project, a work plan broken down into seven work packages (WPs) has been established. The WPs also include management tasks, assessment of progress and exploitation of results: &nbsp;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"http:\/\/www.biogas2pemfc.eu\/index.php?rest_route=\/wp\/v2\/pages\/206"}],"collection":[{"href":"http:\/\/www.biogas2pemfc.eu\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.biogas2pemfc.eu\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.biogas2pemfc.eu\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.biogas2pemfc.eu\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=206"}],"version-history":[{"count":0,"href":"http:\/\/www.biogas2pemfc.eu\/index.php?rest_route=\/wp\/v2\/pages\/206\/revisions"}],"wp:attachment":[{"href":"http:\/\/www.biogas2pemfc.eu\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=206"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}