• HOME
  • ABOUT THE PROJECT
  • WORK PACKAGES
  • NEWS & EVENTS
  • MEDIA
    • PUBLICATIONS
    • PUBLIC DERIVERABLES
    • PROJECT BROCHURES
    • LINKS
    • VIDEOS
  • INSTALLATIONS
  • PARTNERS

INSTALLATIONS

A scaled-up prototype has been built as part of the demonstration activities of the project. This prototype gather all the knowledge generated through the RTD WPs of the project and has been implemented in the Cooperativa San Isidro in Loja, Spain.

Working area
Anaerobic digester and biogas storage tank
Reformer, PEM-FC an control PC

Anaerobic digester
Hydrogen escape system
Hydrogen escape system
DigesterTransportation
Digester Transportation

AluminiumStructure
Aluminium Structure
PEM-FC and reformer structure
PEM-FC and reformer structure
Powercell PEM-FC Interior
Powercell PEM-FC Interior

 

Recent Posts Widget

Biogas2PEM-FC ends: Final review meeting
Oct 31, 2014
Hydrogen escape system
Biogas2PEM-FC prototype is fully deployed: operation phase started
Aug 07, 2014
DigesterTransportation
Arrival of all the prototype elements to the demo site
Jul 15, 2014

Partner Area

Enter

Mail

contact@biogas2pemfc.eu

Subscribe to Mail list

Subscribe


Copyright © 2013 www.biogas2pemfc.eu All rights reserved.